Home | About Us | Agri Kit & Water | Agri Kit & Soil | Agri Kit & Shower | Fertilizer | Q & A | Agri Kit (JP) | Agri Kit (Intl) | Online Order |
Agri Kit
Agri Kit 4 Shower - Installation

Installation - Showerroom Wall
Use suction cups and rubber bands to hold Agri Kit on wall.
Hoses* connections:
- in-feed hose at green tape point
- Out-feed hose at red tape point
Power supply connection:
- AC x DC adapter connected to AC power source (110/220 V)
- Adapter's tip connected at purple tape point

Remark:
Disconnect power after shower for energy conservation.
It is recommended to link power control with light switch.
Periodically drain out the "hard water" at the end cap of leg-pipe.
*Hoses are furnished by user or local dealer.


Installation - Water Piping
Install Agri Kit vertically at desired location.
Pipes** connections:
- in-feed pipe (3/4" or 1/2") at green tape point
- Out-feed pipe (3/4" or 1/2") at red tape point
Power supply connection:
- AC x DC adapter connected to AC power source (110 V)
- Adapter's tip connected at purple tape point

Remark:
Disconnect power after shower for energy conservation.
It is recommended to link power control with bathroom's light switch.
Periodically drain out the "hard water" at the end cap of leg-pipe.
**Pipes are furnished by user or local dealer.

Agri Kit-III Specifications



Agri Kit 4 Shower

Agri Kit 4 Shower

Agri Kit & Shower
 

Ionized water for shower
Installation









VitaBio (USA). All rights reserved. info@vitabio.com